Hardwood Floor Installation in Brandon, SD | Lasting Quality


Brandon has been growing steadily since the 1950s, and its homes show it. This Minnehaha County city about five miles east of Sioux Falls had 11,048 residents at the 2020 census, living in houses built across nearly every decade of the last 70 years. That mix shapes hardwood work here more than almost anything else. A 1970s home might have solid oak hiding under its carpet, a 1990s home might have sheet vinyl glued over a thin underlayment, and a house built in the last ten years usually sits on engineered panel subfloors. Each one needs a different plan.


That's where Sioux Falls Premier Hardwood Flooring starts on every Brandon project: with what's already in the house. Some jobs mean weaving new oak into an original floor so a hallway and bedroom read as one surface. Others mean clearing decades of layers down to the subfloor, or laying wide engineered planks across a newer main level. In every case, lasting quality comes from decisions made early, like board thickness, wear layer, and how each edge meets the next room. Request a quote and we'll talk through your home, your rooms, and how long you plan to enjoy the result.

How Sioux Falls Premier Hardwood Flooring Approaches Your Home

At Sioux Falls Premier Hardwood Flooring, every Brandon project starts with a straight assessment of what's already in the house. If there's sound oak under the carpet, you'll hear whether it can be tied into instead of torn out, and if an older vinyl layer needs testing before removal, that's flagged before any work is priced. Existing floors, stairs, cabinets, and trim that are staying get covered and protected for the length of the job. Estimates spell out removal, prep, materials, and finishing separately, so you can see exactly where the effort goes. When the work is done, you get a clear picture of how to care for the floor so it keeps its looks well beyond the first year.

Brandon, From Sod Schoolhouse to Steady Growth

Brandon Township opened its first school in 1873, and according to the state historical marker on Aspen Boulevard, it was built of sod with a dirt floor, tiny windows, and a wooden shipping box for a teacher's desk. Floors around here have come a long way since. Many of the area's early settlers were of Norwegian descent, and some staked claims before the town was even established. Railroad spikes were driven here on July 15, 1878, and a post office called Brandon has operated since that same year. The name came from Brandon Township, which the railroad linked to Brandon, Vermont. Today the city sits along the Big Sioux River and Split Rock Creek in Minnehaha County.


Brandon didn't grow in one burst. The census counted 200 residents in 1950, 1,431 in 1970, 3,545 in 1990, and 5,693 in 2000, and the city reached 11,048 by 2020. Because building kept pace decade after decade, the housing stock now spans more than 60 years. Homes from the 1960s and 1970s share the city with houses finished last year, and each was built with the materials and methods of its day. For hardwood, that makes the first question simple: when was the house built, and what's been laid down since?

Planning Hardwood Around Your Home's Era

What's underneath matters as much as what goes on top. Homes from the 1960s and 1970s often have plywood subfloors, and some still have original oak strip flooring under wall-to-wall carpet. Houses from the 1970s and 1980s may have sheet vinyl or vinyl tile glued down, sometimes over a thin underlayment stapled every few inches. Flooring and adhesives made before the 1980s can contain asbestos, so suspect layers are tested before anyone pulls them up. Homes from the 2000s onward are usually the most straightforward, since their panel subfloors can take hardwood once they're checked and corrected.


Lasting quality also depends on who lives in the house and for how long. Brandon's median age was 35.4 in the 2020 census, 12.4 percent of residents were 65 or older, and 9.0 percent of households had someone 65 or older living alone. For long-term owners, board construction carries the most weight. Three-quarter-inch solid hardwood can typically be sanded and refinished several times over its life, while an engineered floor's refinishing potential depends on the thickness of its top wear layer, so a thin-veneer product may allow one refinish or none. For owners planning to age in place, a low-sheen finish cuts glare, and flush, low-profile transitions between rooms reduce trip points.

Tying New Hardwood Into Older Brandon Floors

When original oak continues from a hallway into the rooms being updated, the cleanest result usually comes from weaving new boards into the old instead of stopping at a threshold strip. Damaged or mismatched boards along the edge are removed in a staggered pattern, and new boards of the same species and width are laced into the gaps so the joints never line up in a straight seam. Older homes commonly used two-and-a-quarter-inch red oak strip, and matching that width keeps the floor reading as one continuous surface. New wood looks lighter and brighter at first, which is why old and new sections are sanded and finished together.


Height is the other issue in older homes. Floors that have been covered more than once can carry layers of vinyl, underlayment, and pad, and adding three-quarter-inch hardwood on top can leave doors dragging, floor registers sitting low, and an awkward lip where the new floor meets the kitchen or the top of the stairs. Often the better answer is removing old layers down to the subfloor so the new floor sits close to its original height. Where some buildup can't be avoided, register boots are raised, doors are trimmed, and reducer moldings or stair nosing are chosen to keep each edge flush and easy to walk over.

How Brandon Projects Come Together

Every hardwood project moves through the same stages, but older homes add a few checks that newer ones skip. The steps below show where those checks happen and why. Each one is part of the estimate from the start, so nothing gets tacked on halfway through.

Step 1 — First Call and Your Home's Build Year

The first call starts with a few quick questions: which rooms you want to change, what's on the floor now, and roughly when the house was built. Across the 57005 ZIP code, build years run from the mid-1900s to the present, and the answer points straight to what the crew is likely to find underneath. You'll also be asked whether any hardwood already exists in the house, whether the project touches a kitchen or stairs, and how long you plan to stay. Photos of the floors, doorways, and any visible edges of older flooring help set up the visit.

Step 2 — A Look Beneath the Surface

With Interstate 90 running along Brandon's northern edge and Splitrock Boulevard leading into town, a visit from Sioux Falls is a short drive. Rooms are measured, and with your permission, a carpet corner is lifted inside a closet and a floor register cover is pulled to see the layers below. That quick look often answers the big questions: whether original oak is hiding under the carpet, how many layers have built up over the years, and what kind of subfloor supports it all. Moisture and flatness readings are taken during the same visit.

Step 3 — Matching Existing Wood or Starting Fresh

Homes built before Brandon incorporated in 1973 often have narrow red oak strip, while newer homes are open to wider planks and different species. If new boards will tie into an existing floor, matching species, width, and grade comes first, and a sample board is held against the original to check the fit. If the project is a fresh start, the conversation turns to plank width, solid versus engineered construction, wear layer thickness, and finish. Samples are compared in your rooms, under your lighting, before anything is ordered.

Step 4 — Itemized Estimate and Start Date

The estimate lists removal, any material testing, subfloor work, hardwood, installation, and finishing as separate lines, along with a projected timeline. Once you approve it, the start date is set around your household. Families with students in the Brandon Valley School District often choose summer break or school hours for the loudest stages, while others plan around travel or work. The calendar also leaves room for test results and material delivery, so the start date is realistic from day one.

Step 5 — Testing and Removing Old Layers

In a Brandon home built in the 1960s or 1970s, older vinyl and its adhesive may need asbestos testing before removal, and tear-out waits on those results. If a test comes back positive, removal is handled by a qualified abatement contractor before flooring work continues. Once the layers are cleared, staples, nails, and adhesive residue come up, and the subfloor gets a full inspection now that it's exposed. Loose areas are fastened, damaged sections are replaced, and the surface is leveled to the manufacturer's requirements. New hardwood is delivered during this stage so it can adjust to the home's conditions before installation.

Step 6 — Layout and Board Installation

Brandon went from 3,238 housing units in 2010 to 4,038 in 2020, and homes from that decade typically have engineered panel subfloors, while older houses vary. Either way, boards generally run perpendicular to the floor joists, and layout lines are snapped so rows stay straight through long rooms and doorways. Each board is fastened at the spacing the manufacturer calls for, expansion space is held at every wall, and register openings are cut cleanly. Where new flooring weaves into existing oak, the tie-in boards go in as the field reaches them.

Step 7 — Sanding, Staining, and Finishing

Unfinished floors are sanded through several grits, with extra attention at tie-in areas so old and new boards end up flat and even. Stain is tested on the actual floor before the full color goes down, followed by multiple finish coats. Prefinished floors skip sanding and move straight to detail work and trim. Finishing days are a good time to be out of the house, and the trails and river bridges at Big Sioux Recreation Area, west of Robert Bennis Elementary, make for an easy afternoon away while the finish dries.

Step 8 — Final Review and Care for the Long Haul

The final walkthrough covers finish quality, trim, cleanup, and every transition between rooms. For Brandon's older residents, and anyone planning to stay put for years, each doorway is checked for a smooth, trip-free edge. You'll get product-specific care instructions, including which cleaners to use and which to avoid, how to protect the floor under furniture, and what signs mean the finish is ready for a maintenance coat. Following that routine is what turns a well-installed floor into one that still looks right decades from now.

Ready to Plan Your New Hardwood Floor?

Tell us which rooms you're considering, what's on the floor now, and roughly when you'd like the work done. We'll set a time to measure, check the subfloor, and look at species and finish samples in your own space. Request a quote or check availability to get a clear, written plan for your project.